+1 917 8105386 [email protected]

building 2 assignment

Each group must analyse the desired construction systems (as annotated on the drawings) and provide: (a) (b) (c) (d) (e) All this 1. 2. a preliminary budget cost for the project, based on current and commercially available cost data - task due Week 3 a preliminary time schedule for the project development from DA to hand-over using hand-drawn or computer based (MS Project or similar) Gantt chart, - task due Week 4 reproduce a ArchiCAD drawing of this building or using similar computer graphics, or a scaled hand drawing of this building - task due Week 5 a recommendation for a project delivery method, giving clear reasoning for the desired pro-forma contract - task due Week 6, detailed specification for two building systems plus one fit-out trade in Reception or the Café area – task due Week 7, and information must be presented in a logical sequence in two formats: in a written report, - task due Week 9, before the Christmas break, and as a verbal and visual (PowerPoint) presentation to fellow students in your allocated tutorial timeslots – task due Weeks 10 or 11, after the Christmas break.

Ready To Get Started?

GET STARTED TODAY